Protokoll (Prüfung)
report
Description:
The Contractor shall draw up and supply a measurement report for test equipment. The final stage in production, when the end-product is manufactured, reports its requirements to the upstream production stage. A structural analysis and fire inspection and environmental reports are also necessary for most construction projects.
-
Example sentences:
- The Contractor shall draw up and supply a measurement report for test equipment.
- The final stage in production, when the end-product is manufactured, reports its requirements to the upstream production stage.
- A structural analysis and fire inspection and environmental reports are also necessary for most construction projects.